Refurbishment of a walkway

For this project, we were hired to refurbish an existing walkway that had degraded over time and become dangerous to use. Based on the specifications, we designed the new walkway in 3D and manufactured it in our workshop.

Replacing the old walkway with the new walkway took several weeks, which also allowed time to refurbish the main joists.

Deployment
June 2019 / October 2019
Business sectors
Agri-food
Location
Liège

Contact us and request a free quote

WE AIM TO REPLY AS SOON AS POSSIBLE